Sample roof report.
Section by section.
This is the structure both reports follow. Sections marked "full report only" appear only in the full report.
Roof Energy: roof condition report
Report no. [YYYY-NN] · Inspection date [ ] · Report date [ ]
1. Property and request
Property: [type, area, year built if known]. Roof: [tiled with timber frame / flat / mixed], about [ ] m². Reason: [problem / before purchase / before sale / owner abroad]. What the client reported: [ ]. Weather on the day and rain in the previous 7 days: [ ].
2. What was inspected and how
- Interior, roof space and ceilings: visually. Points S[ ]–S[ ].
- Ridges, valleys, chimney, penetrations, parapets: visually. Points S[ ].
- Gutters and outlets: visually, falls. Points S[ ].
- Roof as a whole, by drone (full report only): plan view and sides.
- Sample openings (full report only): about 1 m², [N] points, O1, O2, O3.
3. What was NOT inspected
Every point not inspected is listed here, with the reason: [no safe access to one side] · [no consent for openings: the condition under the tiles is unknown] · [drone not flown: restricted zone or wind]. In every case, the building's structure, permits and legality are outside the scope of the report.
4. Findings by point
S[1], [location]. Condition: [good / monitor / needs work]
Photograph: [S1_a.jpg]
What we saw: [ ]
What it means: [ ]
One block for each point.
5. Points of water entry
W1. Where the water enters: [ ]. Where it shows inside: [ ].
Certainty: [certain / probable / assumption]. Cause: [ ].
Water often does not come out where it goes in, so the certainty is always written down.
6. Condition at each opening (full report only)
O[1], [side, height]. Photographs of each layer: [ ]
Waterproofing (type, continuity, overlaps): [ ]
Insulation (material, thickness, moisture): [ ]
Timber and boarding (rot, insects, deflection): [ ]
All openings reinstated the same hour: [yes / exceptions].
7. Priorities
- 1, now: [what], [why], [when].
- 2, soon: [what], [why], [when].
- 3, keep an eye on: [what], [why], [when].
8. Indicative cost range, where the evidence allows it
[Range by priority. Not a quotation.] No range is given where a hidden point of serious deterioration was not opened, or where there is a structural or legal issue.
9. Conclusion in five lines
[The roof in one sentence. The most serious finding. What comes first. What can wait. What we do not know.]
10. Limits of the report
The report is a technical record by a specialist roofing contractor, for the points inspected with visible and safe access on the day of the inspection. It is not a structural study, a certification, a legal check, a review of permits or a property valuation. Where the findings raise a structural question, it says that an engineer is needed. Any cost range is indicative and not a quotation.
11. Appendix: photographs and footage
[Numbered photographs S1…, O1… with a one-line caption · link to drone footage, where a flight took place]